Kraftwerk Mariastein — Hydroelectric Power Plant (CAVERION Innsbruck)
category:
Energy / Hydropower
location:
Tyrol, Austria
Services:
Electrical Installations · Cable Management · Energy Installations
sector:
Renewable Energy
Underground installation — where physics meets precision
The Mariastein hydroelectric power plant in Tyrol represents one of the most technically demanding projects in our portfolio. Works took place partly in the underground spaces of the dam system, where conditions for electrical installations are exceptionally challenging — humidity, confined spaces and high safety requirements.
The general contractor was the renowned Austrian firm CAVERION Innsbruck, for whom we carried out complete power distribution systems and cabling throughout the entire plant facility.
Partnership with CAVERION — a relationship built on trust in the Austrian market
A reference from CAVERION Innsbruck carries particular weight for us. CAVERION is one of Europe’s leading engineering companies and their trust confirms that COME WORKS meets Austrian market standards — including ÖNORM norms, AUVA safety requirements and the language proficiency of our team.
“The Austrian market sets high standards. We are proud to meet them.”


