logotype
FacebookInstagramLinkedin
  • HOME
  • ABOUT US
  • SERVICES
  • REFERENCES
  • CONTACTS
  • English
    • Deutsch
    • English
    • Slovenčina
    • Italiano
SEARCH
logotype
logotype
  • HOME
  • ABOUT US
  • SERVICES
  • REFERENCES
  • CONTACTS
  • English
    • Deutsch
    • English
    • Slovenčina
    • Italiano
SEARCH
logotype
  • HOME
  • ABOUT US
  • SERVICES
  • REFERENCES
  • CONTACTS
  • English
    • Deutsch
    • English
    • Slovenčina
    • Italiano
Portfolio
HomeAssembly worksIndustrial Hall — Steel Structure Assembly

Industrial Hall — Steel Structure Assembly

category:

Industrial Construction / Steel Structures

location:

Berlin, Germany

Services:

Steel Structures & Halls · Assembly Works · Metalwork & Steel Fitting

sector:

Industrial / Manufacturing

Berlin 2025 — steel erection for a manufacturing and logistics hall

A new manufacturing and logistics hall in Berlin required the assembly of a primary and secondary steel structure across a large footprint, with tight tolerances demanded by the client’s production equipment layout. Column base positions, rafter apex levels and eaves heights all had to be within specified tolerances to ensure that the subsequent crane gantry, mezzanine and cladding works could proceed without remediation.

COME WORKS was appointed as steel erection subcontractor on a fixed-price, fixed-programme basis — the conditions under which German general contractors prefer to work. We mobilised a full erection team, completed the pre-erection anchor bolt survey within the first day, and commenced column erection on schedule. The structure was completed within the agreed programme and handed over with a structural engineer’s survey confirming compliance with all dimensional tolerances.

Berlin — a competitive market where reliability is the differentiator

The Berlin construction market is one of the most active in Germany. Subcontractor reliability — or its absence — is well known among general contractors in the region. A subcontractor that performs on the first project in Berlin builds a pipeline of repeat work; one that fails on programme or quality builds nothing.

COME WORKS entered the Berlin market with the same approach that has defined our work in Austria for the past several years: certified workforce, own equipment, single point of contact, zero punch list at handover. The result in Berlin was the same as the result in Vienna or Innsbruck — a project delivered as specified, and a general contractor who called again.

“Berlin, Frankfurt, Munich — the same standard in every city. That is the only way to build a reputation in the German market.”

PREV

Hospital Extension — Steel Structures

RELATED PROJECTS

Takeda Austria GmbH — Pharmaceutical Plant
Assembly worksIndustrial electrical installationsMetalwork & Steel fitting
Hospital Extension — Steel Structures
Assembly worksMetalwork & Steel fittingSteel structure
UCB Pharma SA — Pharmaceutical Manufacturing
Assembly worksMetalwork & Steel fittingWelding & Pipework

Your partner for construction projects.

info@comeworks.eu
+43 664 7542 0985
FacebookInstagramLinkedin-in

Company

Construction Works
Electrical Engineering
Legal notice (Imprint)
Privacy Policy (GDPR)
Cookies

Certifications & Countries

EN ISO 9001:2015
EN ISO 14001:2015
ISO 45001:2018

© 2026 COME WORKS, Created by ReVisual. All Rights Reserved

COME WORKS