logotype
FacebookInstagramLinkedin
  • Home
  • Über uns
  • DIENSTLEISTUNGEN
  • Literaturverzeichnis
  • KONTAKT
  • Deutsch
  • English
SEARCH
logotype
logotype
  • Home
  • Über uns
  • DIENSTLEISTUNGEN
  • Literaturverzeichnis
  • KONTAKT
  • Deutsch
  • English
SEARCH
logotype
  • Home
  • Über uns
  • DIENSTLEISTUNGEN
  • Literaturverzeichnis
  • KONTAKT
  • Deutsch
  • English
Portfolio
HomePortfolioIndustriehalle – Montage der Stahlkonstruktion

Industriehalle – Montage der Stahlkonstruktion

category:

Industrial Construction / Steel Structures

location:

Frankfurt, Germany

Services:

Steel Structures & Halls · Assembly Works · Metalwork & Steel Fitting

sector:

Industrial / Logistics

Frankfurt 2025 — steel structure for a large-span industrial hall

The assembly of a large-span industrial hall near Frankfurt required mobilisation of a specialist steel erection team with experience in primary structural steelwork, secondary steel and roofing support systems. The structure comprised hot-rolled steel columns and rafters, cold-formed purlins and side rails, wind bracing systems and a complete mezzanine floor package — all erected from a standing start to structural completion within the agreed programme.

COME WORKS carried out the full steel erection scope as subcontractor to the general contractor. Works included checking of anchor bolt positions prior to erection, lifting of columns and rafters using a mobile crane working to a defined lift plan, installation of bracing and connections with high-strength structural bolts, and final plumb, level and line verification before handover to the cladding contractor.

Large-span steel — where programme pressure and structural precision collide

Industrial hall construction in Germany operates to tight programmes driven by tenant move-in dates or production start deadlines. A steel erection subcontractor who cannot maintain the erection sequence — or who produces a structure that fails the structural engineer’s survey — creates a cascade of delays across every following trade.

COME WORKS approaches steel erection with the same programme discipline that general contractors apply to their overall schedule. Pre-erection surveys, daily progress reporting, immediate communication of any tolerance deviation and a zero-punch-list handover philosophy are standard on every steel project we undertake. The Frankfurt hall was handed over structurally complete, plumb and level, on the agreed date.

„A hall that stands straight and true on handover day is the result of a thousand small decisions made correctly during erection. That is our job.“

PREV

Krankenhauserweiterung – Stahlkonstruktionen

NEXT

Wohnbebauung – Balustraden, Geländer und Metallarbeiten

RELATED PROJECTS

GKI Pfunds – Wasserkraftwerk
Kernkraftwerk Mochovce – Steuerungssysteme von PPA
Krankenhauserweiterung – Stahlkonstruktionen

Schreibe einen Kommentar Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Your partner for construction projects.

info@comeworks.eu
+43 664 9337 4218
FacebookInstagramLinkedin-in

Company

Construction Works
Electrical Engineering
Legal notice (Imprint)
Privacy Policy (GDPR)
Cookies

Certifications & Countries

EN ISO 9001:2015
EN ISO 14001:2015
ISO 45001:2018

© 2026 COME WORKS, Created by ReVisual. All Rights Reserved

COME WORKS